Focusing on TRS sheds involved with overhauling and assembly degree routine maintenance of 25KV AC electric powered locos in electrical loco sheds is the worker’s obligation. Candidates preparing for numerous other RRB tests can Look at the following hyperlinks for complete preparing and revision- In densely populated spots, there won't https://railway-group-d-jobs67777.diowebhost.com/87117496/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf