As observed from your figure under, ongoing auger is utilized to drill the borehole, raise up drilled soil, and pour concrete when the auger is moved up. Consequently, the borehole doesn't need casing or hydrostatic tension to stop damage to the borehole wall. Lost your password? Be sure to enter https://teresao489pdc3.bcbloggers.com/profile