1

Advanced 400 kW Chiller Installation Achieves £50K Annual Cost Reduction on Energy and 200 Metric Tonnes CO₂ Cut

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a cutting-edge 400 kW chiller, marking the successful conclusion of the project. Designed to reinforce ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://thebookmarkplaza.com/story20632165/high-efficiency-400-kw-chiller-installation-achieves-50k-yearly-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story